Reinders Corporation®
Home Projects Steel construction

Steel construction

ACMAN supplied and installed a powder-coated steel structure for an industrial hall in Almelo.

location icon Almelo, the Netherlands

Project stages: Consult, design and result

Enerdes climate control

1 Consult

ACMAN consulted with MIBO to understand their specific requirements for the industrial hall. This involved assessing the site and determining the specifications needed for the steel construction.

Greenhouse Boiler Room

2 Design

Based on the consultation, ACMAN designed a custom steel structure tailored to MIBO’s needs. The design focused on durability, functionality, and aesthetic integration with the existing infrastructure. The steel components were powder-coated to ensure long-lasting protection and a high-quality finish.

3 Result

The implementation of ACMAN’s steel construction significantly enhanced the industrial hall at MIBO. The new structure provides robust support and meets high standards of quality and safety, supporting the facility’s operational efficiency.

Need advice from our specialists?

What did we build?

Where was this steel structure built?

comment icon

Contact us

    Contactformulier onderaan

    Plesmanweg 21
    7602 PD Almelo
    The Netherlands

    info@reinderscorp.com
    +31 (0) 546 – 876500